Case Studies
vfd & Control cabinet replacement
Cost and Energy Savings
- 3 Cooling Towers Impacted
- Replaced to allow control of the towers to run through Siemens Controls
Vertical Transportation upgrade
Cost and Energy Savings
- 5 Elevator Cabs
- Glass to Stainless Steel
- Additional Lighting Upgrade
lighting retrofit
Reducing Carbon Footprint and Utility Bills
- 2,600 Light Fixtures Retrofitted
- 300 Additional Lighting Control Sensors Installed
- Reduction of 3 Million pounds of carbon emissions annually